Extraction Condensing (Back-Pressure) Agregate
| Boilers: | ||
| Manufacturer | Ganz | Djuro Djakovic |
| Capacity | 2 x 40/50 kg/s | 75 kg/s |
| 2 x 1 45/180 t/h | 720 t/h | |
| Fresh steam pressure | 94 bar | 94 bar |
| Steam temperature | 535 oC | 535 oC |
| Year of construction | 1966 | 1984 |
| Turbines: | ||
| Manufacturer | Jugoturbina | Jugoturbina |
| Nominal capacity | 2 x 32 MW | 50 MW |
| Steam pressure | 90 bar | 90 bar |
| Steam temperature | 535 oC | 535 oC |
| Technologic steam pressure | 8.5 bar | 8.5 bar |
| Heating steam pressure | 2.5 bar | 1.4 bar |
| Year of construction | 1966 | 1984 |
| Peak Load Heating Station (LPB - low pressure boiler station) | ||
| Boilers: | Hot Water | Steam |
| Manufacturer- type | TPK - VKLM | TPK BKG - 200 |
| Nominal capacity | 2 x 58 MW | 2 x 5.6 kg/s (20 Vh) |
| Water flow | 2 x 0.28 m3/s | |
| Temperature of water-steam | 130/195 oC | 280 oC |
| Steam differential pressure | 20 bar | 10 bar |
| Year of construction | 1979 | 1985 |
| Heating Stations and Water Pump Station | ||
| Thermal power | 116 MW | 116 MW and 2 x 60 MW |
| Network water flow | 0.78m3/s | 1.11 m3/s and 0.56m3/s |
| Pre-flow pressure | 10.0 bar | 10.0 bar |
| Return pressure | 1.5 bar | 1.5 bar |
| Technological steam | 13.5 kg/s (50 Vh) | 13.5 kg/s (50 Vh) |
| Year of construction | 1966 | 1984 and 1979,1985 |